What is an important difference between capacity planning in services and capacity planning in manufacturing operations?


A) Time
B) Location
C) Demand volatility
D) Utilization affects service
E) All of these

F) C) and D)
G) A) and B)

Correct Answer

verifed

verified

The problem of keeping demand sufficiently high to keep a large factory busy is a sales issue and not a diseconomy of scale.

A) True
B) False

Correct Answer

verifed

verified

Sharing capacity is a common source of external capacity.

A) True
B) False

Correct Answer

verifed

verified

The basic notion of economies of scale is that as a plant gets larger and volume increases, the average cost per unit of output drops.

A) True
B) False

Correct Answer

verifed

verified

Economies of scope exist when multiple products can be produced at a lower cost in combination than they can separately.

A) True
B) False

Correct Answer

verifed

verified

A production facility develops virtuosity and works best when it focused on a widely varied set of production objectives.

A) True
B) False

Correct Answer

verifed

verified

False

Long-range capacity planning requires top management participation.

A) True
B) False

Correct Answer

verifed

verified

If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity utilization rate?


A) 0.75
B) 1.00
C) 1.33
D) 2.33
E) 300

F) C) and E)
G) B) and E)

Correct Answer

verifed

verified

When evaluating capacity, managers need to consider both resource inputs and product outputs.

A) True
B) False

Correct Answer

verifed

verified

Capacity can be defined as the amount of available resource inputs relative to requirements for output over a particular period of time.

A) True
B) False

Correct Answer

verifed

verified

The larger the capacity cushion, the better.

A) True
B) False

Correct Answer

verifed

verified

False

A capacity cushion is the amount of capacity less than expected demand.

A) True
B) False

Correct Answer

verifed

verified

False

At a decision point in a decision tree, which machine would you select when trying to maximize payoff when the anticipated benefit of selecting machine A is $45,000, with a probability of 90%; the expected benefit of selecting machine B is $80,000, with a probability of 50%; and the expected benefit of selecting machine C is $60,000, with a probability of 75%?


A) Machine A
B) Machine B
C) Machine C
D) You would be indifferent between machines A and C.
E) You would be indifferent between machines A and B.

F) B) and D)
G) A) and C)

Correct Answer

verifed

verified

The way to build in greater flexibility in your workers is to do which of the following?


A) Pay higher wages to motivate a willingness to do a variety to tasks.
B) Provide a broader range of training.
C) Provide a wide variety of technology to augment workers skills.
D) Institute a "pay for skills" program.
E) Use part-time employees with specialized skills as needed.

F) A) and D)
G) A) and E)

Correct Answer

verifed

verified

Which of the following is not a step used in determining production capacity requirements?


A) Forecasting to predict product sales
B) Forecasting raw material usage
C) Projecting availability of labor
D) Calculating equipment and labor needs
E) Projecting equipment availability

F) A) and C)
G) C) and D)

Correct Answer

verifed

verified

A production facility works best when it focuses on a fairly limited set of production objectives.

A) True
B) False

Correct Answer

verifed

verified

The objective of strategic capacity planning is to determine the overall capacity level of capital intensive resources (including facilities, equipment, and overall labor force size) that best supports the company's short-range competitive strategy.

A) True
B) False

Correct Answer

verifed

verified

Because services cannot be stored for later use, service managers consider time as one of their supplies or resources.

A) True
B) False

Correct Answer

verifed

verified

Making adjustments to eliminate the variance between planned and actual output is tied into intermediate-range capacity planning.

A) True
B) False

Correct Answer

verifed

verified

Compared with a service operation, a manufacturing operation's capacity is which of the following?


A) More dependent on time and location
B) Subject to more volatile demand fluctuations
C) Utilization more directly impacts quality
D) Demand can be smoothed by inventory policies
E) More capable of reacting to demand fluctuations

F) B) and E)
G) A) and B)

Correct Answer

verifed

verified