Filters
Question type

Study Flashcards

Identify the following quality control activities as either value-added or non-value-added. -Preventive machine maintenance


A) Value-added
B) Non-value-added

C) A) and B)
D) undefined

Correct Answer

verifed

verified

Identify the following quality control activities as either value-added or non-value-added. -Rework


A) Value-added
B) Non-value-added

C) A) and B)
D) undefined

Correct Answer

verifed

verified

Set up time is disregarded as an improvement priority under the manufacturing concept.


A) traditional
B) lean
C) total quality management
D) product cost

E) A) and D)
F) B) and D)

Correct Answer

verifed

verified

Identity the following by their type of quality cost. -Operator training


A) Preventive costs
B) Appraisal costs
C) Internal failure costs
D) External failure costs

E) A) and D)
F) A) and C)

Correct Answer

verifed

verified

Push manufacturing is also referred to as make-to-order processing.

A) True
B) False

Correct Answer

verifed

verified

Axelgold Company produces parts for the auto industry.Part X2 is machined in Department #1, which has the following budgeted conversion costs: Axelgold Company produces parts for the auto industry.Part X2 is machined in Department #1, which has the following budgeted conversion costs:    All costs are driven by machine hours.Total possible hours for the year are 2,800.It takes .03 hours to machine one unit of Part X2. a Compute Department #1's budgeted cell conversion cost rate for the current year.Round to the nearest cent. b Compute Part X2's budgeted cell conversion cost per unit.Round to the nearest cent. All costs are driven by machine hours.Total possible hours for the year are 2,800.It takes .03 hours to machine one unit of Part X2. a Compute Department #1's budgeted cell conversion cost rate for the current year.Round to the nearest cent. b Compute Part X2's budgeted cell conversion cost per unit.Round to the nearest cent.

Correct Answer

verifed

verified

a Budgeted cell conv...

View Answer

In the lean principles philosophy, unexpected downtime is the result of unreliable processes.

A) True
B) False

Correct Answer

verifed

verified

A nonfinancial measure is operating information that has not been translated into dollars.

A) True
B) False

Correct Answer

verifed

verified

From the above schedule, calculate the a prevention and b appraisal costs.

Correct Answer

verifed

verified

a $102,000 = $26,000...

View Answer

Identify the following quality control activities as either value-added or non-value-added. -Finished goods inspection


A) Value-added
B) Non-value-added

C) A) and B)
D) undefined

Correct Answer

verifed

verified

In a lean environment, process problems are more visible than they are in a traditional environment.

A) True
B) False

Correct Answer

verifed

verified

Lead time reduction can be a cost-saving goal for any processed item.

A) True
B) False

Correct Answer

verifed

verified

Identity the following by their type of quality cost. -Recalls


A) Preventive costs
B) Appraisal costs
C) Internal failure costs
D) External failure costs

E) B) and D)
F) All of the above

Correct Answer

verifed

verified

Large batch sizes increase lead time.

A) True
B) False

Correct Answer

verifed

verified

In a lean system, indirect labor is traced directly to product cells.

A) True
B) False

Correct Answer

verifed

verified

Lean manufacturing is also called make-to-stock manufacturing.

A) True
B) False

Correct Answer

verifed

verified

Which of the following are features of the lean manufacturing system? a maintaining excess inventory to ensure that products will always be available b cross training of employees c giving employees additional authority and responsibility d product-oriented layout e increased set-up time

Correct Answer

verifed

verified

manufacturing philosophy emphasizes quality and zero defects.


A) Traditional
B) Lean
C) Zero-Based
D) Chinese

E) All of the above
F) A) and B)

Correct Answer

verifed

verified

Which of the following results in long lead time?


A) long setup times
B) large batch sizes
C) large inventories
D) all of the above

E) C) and D)
F) A) and C)

Correct Answer

verifed

verified

From the foregoing information, determine the budgeted cell conversion cost per unit.


A) $240.00
B) $268.00
C) $296.00
D) $1,842.50

E) B) and D)
F) C) and D)

Correct Answer

verifed

verified

Showing 61 - 80 of 137

Related Exams

Show Answer